Project News / Commercial
HighPoint Church Plans $14.3 Million Campus With 770-Seat Sanctuary in Friendswood

A state filing describes a 32,655-square-foot campus on West Parkwood Avenue, with construction targeted for January 2027.
HighPoint Church of Texas Inc. plans a $14.3 million church building at 1406 W. Parkwood Ave. in Friendswood, Galveston County, according to a state filing registered on Nov. 22, 2026. The filing lists an estimated construction cost of $14,310,492 for a new 32,655-square-foot building with a 770-seat sanctuary, classrooms and coffee service.
The building is described as a sprinklered pre-engineered metal building, a structure whose steel frame and panels are fabricated in a factory to set dimensions and bolted together on site. That system is common for churches and large open rooms because it spans wide spaces quickly and at lower cost than a conventional steel frame. The sprinkler system means the full building will carry fire protection throughout.
The filing lists a construction start of Jan. 13, 2027, and completion on Oct. 13, 2028, a schedule of about 21 months. Both dates are filing estimates. The project is privately funded on private land for private use, and it is registered for state accessibility review, which checks the plans against Texas accessibility standards before and after construction.
Checking your membership…



