Project News / Healthcare
Houston Methodist Plans $18.9 Million 33-Bed ICU in Brockman Centennial Tower

The filing covers 50,852 square feet of shell space on level 14 of the new Texas Medical Center tower, designed by Stantec, with work from February 2027 to July 2028.
Houston Methodist has registered an $18.9 million buildout of level 14 at the Houston Methodist Brockman Centennial Tower, 6541 Bertner Ave. in the Texas Medical Center, according to a state filing dated Nov. 23, 2026. The filing lists an estimated construction cost of $18,902,679. The scope is an interior buildout of shell areas on level 14 into a 33-bed intensive care unit and clinical support areas.
The project covers 50,852 square feet. TDLR records list private funding and a schedule from Feb. 1, 2027, to July 31, 2028. Stantec Architecture's Houston office is the design firm, and William Winning of Houston is the registered accessibility specialist. No general contractor is named.
The 26-story tower is Houston Methodist's $1.4 billion replacement and expansion of its main hospital. Houston Methodist announced the project in April 2022, saying it would hold nearly 400 beds, including 175 new beds and 207 that replace beds in the Main building. The Main building and West Pavilion will eventually be demolished. The health system says the tower will replace existing space for transplant medicine, intermediate care and surgical intensive care. It also includes an emergency department that nearly doubles in size to 54 beds, seven replacement operating rooms and two added operating suites.
Checking your membership…


