Project News / Industrial
$33 Million, 500,000-Square-Foot Industrial Warehouse Planned in Hutto

The proposed one-story tilt-up building on Limmer Loop has a filed January to November 2027 schedule and no tenant identified.
Titan Hutto X has registered a $33 million speculative warehouse in Hutto, according to a state filing registered Nov. 10. The project, called Hutto 10 Spec, is a new one-story, approximately 525,000-square-foot tilt-up concrete building at 2234 Limmer Loop in Williamson County.
The filing describes "speculative space serving warehouse functions for a future tenant." The filed construction schedule runs from Jan. 8, 2027, to Nov. 15, 2027, at an estimated cost of about $63 per square foot. The owner is based in Austin, with Kip Maxwell listed as contact. No design firm or tenant is assigned, and no general contractor has been named.
Scope and schedule
The filing’s area field lists 525,000 square feet, while its scope narrative gives 525,115 square feet. Both describe the same one-story tilt-up warehouse. Registration documents the proposed accessibility scope and schedule; it does not confirm a tenant lease, city permit issuance or a physical construction start.



