SpaceX Plans 8-Mile Natural Gas Pipeline to Fuel Starship Launches

SpaceX logo

The 16-inch Starpipe would supply a planned methane liquefaction facility at Starbase. A second, 24-inch pipeline filing brings Lone Star Mineral Development’s proposed network to 11.87 miles.

SpaceX is planning an 8.11-mile natural gas pipeline in Cameron County to supply its Starbase launch and production complex. Called Starpipe, the proposed 16-inch transmission line was filed with the Railroad Commission of Texas by SpaceX affiliate Lone Star Mineral Development LLC on May 18, 2026. It forms part of the company’s effort to build a dedicated fuel supply for Starship operations.

The project would connect the Port of Brownsville area with Starbase at Boca Chica, where a planned liquefaction facility would turn incoming natural gas into liquid methane. Starship and its Super Heavy booster use methane and liquid oxygen as propellants. Supplying gas by pipeline would reduce dependence on trucked fuel as SpaceX pursues a higher launch rate.

The affiliate has since filed a second Cameron County line, Port Pipeline 1. That proposal covers 3.76 miles of 24-inch natural gas transmission pipe, taking the two registered systems to 11.87 miles combined. The filings identify separate new systems; they do not establish the second line’s precise route or how it would connect with Starpipe.

Checking your membership…