FlexEtc Picks Dallas Sovereign Row for Its Second Texas Shared Warehouse Site

FlexEtc’s existing Plano shared warehouse facility
Reference photograph: FlexEtc’s existing Plano location.

The Los Angeles-based operator plans to turn a 58,096-square-foot industrial building into small-business warehouse suites, with state records listing $1.3 million in work starting in December.

FlexEtc, a Los Angeles-based operator of shared warehouse and workspace buildings, plans to convert an industrial building at 8500 and 8600 Sovereign Row in Dallas into warehouse suites for small businesses. The company said on Nov. 17, 2026, that its investment in the project will exceed $2 million. The site, near the Dallas Design District, will be FlexEtc's second location in Texas, after Plano.

A state accessibility filing with the Texas Department of Licensing and Regulation, project TABS2027003213, lists the project as FlexEtc Sovereign Row. It describes the work as the renovation of 58,096 square feet of space into a co-warehousing facility, with an estimated construction cost of $1.3 million. Work is scheduled from Dec. 18, 2026, to April 21, 2027. The owner is listed as Addie1 LLC at the property's address. GMA Architects of the St. Louis area is the design firm.

FlexEtc's model splits larger industrial buildings into small, lockable units that businesses rent on short terms instead of signing a traditional industrial lease. On its website, the company says members can choose from four space types under one membership. Those include a coworking seat with dock access, private offices, shared "Labs" where up to 12 companies share a workspace with dock access and storage, and private warehouse units that combine warehouse, office and storage. Private units run from 300 to 3,000 square feet, and growing businesses can start at 175 square feet.

Checking your membership…